DATA REPORT · H1 2026

Paperwork disqualifications on 나라장터 — H1 2026, counted.

We aggregated every negotiated-contract (협상에 의한 계약) service tender opened between Jan 9 and Jul 8, 2026 from public 나라장터 bid-opening records: 32,319 notices, 68,912 bids, 12,796 distinct bidders. This report covers the bidders who were cut before their proposal was ever evaluated — on paperwork alone.

Published 2026-07-25 · data through 2026-07-08 · Monthly editions of this count →

423distinct bidders disqualified on preventable paperwork grounds
525notices where at least one such slip occurred
₩127.6Bcombined estimated price of those notices

The four preventable grounds

Of all disqualification reasons recorded in bid-opening data, four are pure pre-submission paperwork — checkable before the deadline: proposal not submitted, required documents not submitted, bid over the project budget, and company-name/CEO mismatch across documents. In H1 2026 they disqualified 423 distinct bidders in 734 bid entries.

GroundEntriesDistinct bidders
Proposal not submitted417247
Required documents not submitted225107
Bid over project budget7564
Name/CEO mismatch across documents1716

By distinct bidders

Proposal not submitted247
Required documents not submitted107
Bid over project budget64
Name/CEO mismatch across documents16

How much was at stake in those slips

Estimated price (추정가격) of the 525 notices where a preventable slip occurred. These are not small tenders: 60% are ₩100M+, and the largest single notice was ₩4.36B.

Under ₩100M209
₩100–300M212
₩300–500M46
₩500M–1B35
₩1B+20
No price listed3

It happens every month, not in one bad season

Preventable paperwork disqualifications occur every month — 73 to 154 entries a month through H1 (July covers only the first week of the period). This is not a one-off accident season; it is a constant tax on bidders who assemble packages under deadline pressure.

Jan73
Feb133
Mar114
Apr126
May127
Jun154
~Jul 87

The full picture

For context, all recorded grounds. The largest — negotiation-evaluation ineligibility (5,502 bidders) — is about proposal substance, a different problem. The paperwork grounds above come earlier: a gate a bid must pass before its proposal is even evaluated. Price-over-예정가격 (213 entries) is excluded from the preventable set: the reserve price is drawn at opening and cannot be checked in advance.

Paperwork & eligibility grounds compared (distinct bidders)

Negotiation-evaluation ineligibility (5,502 bidders) is omitted from this chart — it is proposal-substance, on a different scale; see the table below.

Proposal not submitted247
Required documents not submitted107
Over reserve price (예가)131
Other eligibility grounds162
E-bid cancellation request68
Bid over project budget64
SME requirement not met57
Direct-production requirement not met46
Bid bond not paid30
Name/CEO mismatch across documents16
Joint-venture agreement violation12

Preventable before submission Other grounds

GroundEntriesDistinct bidders
Negotiation-evaluation ineligibility12,5825,502
Proposal not submitted417247
Required documents not submitted225107
Over reserve price (예가)213131
Other eligibility grounds191162
E-bid cancellation request12368
Bid over project budget7564
SME requirement not met7157
Direct-production requirement not met5446
Bid bond not paid3230
Name/CEO mismatch across documents1716
Joint-venture agreement violation1312

Method and limits

Source: public 나라장터 (G2B) bid-opening records — negotiated-contract service tenders opened 2026-01-09 through 2026-07-08. Counts are unique bidders per ground (a bidder can appear under multiple grounds) and raw bid entries.

How the headline figures relate: the per-ground bidder counts sum to 434, which exceeds the 423 distinct companies because a company disqualified on more than one ground is counted once per ground. The 525 notices exceed the company count because one company can be disqualified across several notices — the 734 bid entries are the raw total.

The ₩127.6B figure is the combined estimated price (추정가격) of the 525 notices where at least one preventable slip occurred — it measures what was at stake in those tenders, not lost revenue: a disqualified bidder was not guaranteed to win.

No individual company or agency is named. All figures are aggregates.

This is the exact failure class Miriboa checks before you submit.

Required-document completeness, price-vs-budget arithmetic, name and date consistency — verified against the notice with verbatim evidence, before the deadline.

Get your first verification freeWeekly notice alerts — free